Construction and installation of (6) elevators in the garage area of ​​Terminal (3) – Cairo Airport

Project: Construction and installation of (6) elevators in the garage area of ​​Passenger Terminal No. (3) - Cairo Airport

Owner: Cairo Airport Company

Project Overview:

Project Duration: 6 months

Project Gallery

  • Gallery Image 1
  • Gallery Image 2
  • Gallery Image 3
  • Gallery Image 4
  • Gallery Image 5
Construction and installation of (6) elevators in the garage area of ​​Terminal (3) – Cairo Airport | Yathreb