Air Control Tower

Name : Securing the operation of the old tower (2) as an alternative to the air traffic control tower No. (3)

Owner: National Air Navigation Services Company

General Contractor: Arab Organization for Industrialization (Arab Company for Real Estate and Tourism Projects)

About the project: Project Duration: 12 Months  

Project Gallery

  • Gallery Image 1
  • Gallery Image 2
  • Gallery Image 3
  • Gallery Image 4
  • Gallery Image 5
  • Gallery Image 6
  • Gallery Image 7
  • Gallery Image 8
  • Gallery Image 9
Air Control Tower | Yathreb